Location:
José Antonio Anzoátegui Petrochemical Complex, Anzoátegui-Venezuela.
Duration:
06/11/2022 to 06/01/2023
Summary:
Bifurca, with personnel with vast experience in the area of plant inspection and engineering, was in charge of the general and specific requirements presented by Supermetanol CA. For the detailed inspection of the different equipment that make up this plant. Support was also provided in the revision of the RDI, all this with the goal of preparing a scope of work for the execution of activities, preparation of material purchase requisitions and estimation of costs of services and materials, and review the recommendations presented in the RDI. All this with the intention of presenting proposals for the execution of corrections and repairs in the plant, dividing which ones should be programmed for a plant shutdown and which ones can be executed when the plant is in production.